Whole-home remodeling by Lux Builders typically starts at $250,000. A whole-home remodel is a sequencing problem as much as a construction problem — rooms, systems and trades in the right order, priced as one number before we start. That is a range, not a quote. The design phase is what turns it into a real number, and once that number is set it does not move.
Fifteen minutes, on the phone, with a builder — not a salesperson — to see if we’re a fit. No obligation.
The spread on a whole-home remodel is wider than any other project — because the scope is the variable. Here is what actually moves it.
A historic farmhouse renovation. A Pinckney cabin taken down to its bones and rebuilt. A whole-house remodel with the kitchen relocated entirely. The photographs below are those projects — not stock.
One team owns the plan, the budget and the schedule, from the first drawing to the last walkthrough.
Change orders exist because decisions get deferred. An allowance is a decision deferred with a placeholder number attached. Move every decision in front of the contract and there is nothing left to change-order.
The design fee is 1–3% of projected project cost, and it buys more than drawings. It also buys the homework: non-destructive inspections of what is behind the walls, under the floors and above the ceilings — so your price is built on what your house actually is, not on what anyone hopes it is. A portion credits toward your build agreement if that agreement is signed within 90 days.
Cabinetry, counters, tile, fixtures, hardware, flooring, paint — every one chosen, priced and signed. Estimating does not begin until every selection carries your signature.
One fixed price, with a job scope addendum attached that accounts for every item on the job. Nothing left to allowances by the time you sign. The number is the number.
Once the build contract is signed, we develop the final construction plans — the working drawings your job is built and inspected from. Every trade bid at least twice. No subcontractor on site until their release is signed off. A written schedule, and an update on the same day every week.
No stock photography anywhere on this site.





Whole-home remodeling by Lux Builders typically starts at $250,000 and climbs with scope — how many rooms, whether systems are upgraded house-wide, and whether the layout is redrawn. The price is fixed before construction begins. That is a range, not a quote.
Often, yes — phased. A vacant house is faster and costs less; a phased remodel keeps you home. Both are planned honestly up front, and the schedule you sign reflects the one you chose.
Opening a 1990s wall is predictable. Opening a 1940s wall can reveal knob-and-tube wiring, galvanized plumbing, or framing that was creative the day it went up. Older homes carry a wider design contingency — resolved in design, priced in the contract, not discovered as a change order.
When the scope calls for it, yes — designed and priced with the rest of the project, performed by separately licensed trades, and warranted by the people licensed to stand behind it.
The same way it is possible on a kitchen: every decision is made before the contract. Design plans complete, 100% of selections signed with zero TBDs, and a job scope addendum listing every item attached to the contract.
Tell me what you are thinking about and roughly when. I will tell you what it costs, what it involves, and whether it is worth doing — including when the answer is no.
Mon–Fri, 9am–5pm. It rings to a builder, not a call center.
Prefer email? info@myluxbuilder.com
You will hear from me within the hour during business hours, and first thing tomorrow if you sent this in the evening. If it is urgent, call (810) 222-1016.